Semiconductor Assembly & Test

Product


Purpose/Scope:

  • Visualize and Measure current material flow
  • Recommend relayout changes to smooth flow & reduce distance traveled

Results in 1 week:

  • Material flow for the top 9 products were documented, modeled, and analyzed.
  • 3 relayout changes were created.
  • New layout reduced annual flow by 2.8 million meters / 3.1 million yards

View Full Case Study