ProPlanner International Assembly Plant

Product


  • Optimize tugger and fork flow in Assembly and Body Shops
  • Improve 20 process documents and Unit Load Datasheet format for all aspects of material movement at both the Assembly Plant, on-site Logistics and Deconsolidation Center.
  • Train engineering staff to complete all aspects of manufacturing and material handling engineering.

View Case Study