Purpose/Scope: Visualize and Measure current material flow Recommend relayout changes to smooth flow & reduce distance traveled Results in 1 week: Material flow for the top 9 products were documented, modeled, and analyzed. 3 relayout changes were created. New layout reduced annual flow by 2.8 million meters / 3.1 million yards View Full Case Study